First of six LNG carriers delivered to ADNOC L&S

Company added 23 new vessels in 2024

ADNOC L&S took delivery of first new-build LNG carrier from Jiangnan Shipyard ahead of schedule. (Image: ADNOC)

ADNOC Logistics and Services, a global energy maritime logistics leader, has taken delivery of Al Shelila, the first of six newbuild liquified natural gas (LNG) carriers from Jiangnan Shipyard in China.

The vessel has been delivered two months ahead of schedule, with the remaining five expected to be delivered in 2025 and 2026.

“In Arabic, Shelila represents strength and grace, qualities that reflect the legacy of our forefathers’ vessels,” said Capt. Abdulkareem Al Masabi, CEO of ADNOC L&S. “As we expand our fleet to meet rising global demand for natural gas, our deepening partnership with Jiangnan Shipyard underscores the strong industrial ties between the UAE and China, reinforcing our shared commitment to powering global economic growth.”

ADNOC L&S awarded shipbuilding contracts to Jiangnan Shipyard in 2022 for the six LNG carriers as part of the company’s strategic fleet expansion to meet the growing global demand for natural gas as a lower-carbon energy source. During 2024, the company further strengthened and modernized its asset base with new build contracts for up to 23 new energy-efficient vessels, including 8-10 LNG carriers, nine Very Large Ethane Carriers (VLECs) and four Very Large Ammonia Carriers (VLACs), adding in excess of 340 years of contracted income year-to-date.

Al Shelila has a capacity of 175,000m3, significantly larger than the 137,000m3 capacity of ADNOC L&S’ current LNG carriers. Equipped with advanced energy-efficient technologies, including two new-generation LNG dual-fuel main engines, the vessel is designed to reduce methane emissions by up to 50% compared to older-generation technology.

Latest News
AXH air-coolers expanding Oklahoma manufacturing operations
Projects in Sapulpa and Claremore will add a combined 336,500 square feet of manufacturing space
Woodside to reduce investment in Beaumont ammonia facility following strategic review
Production disruptions and slower development of the lower-carbon ammonia market prompt portfolio reassessment, while the Texas facility targets lower-carbon production in 2027
Atlas Copco reports stronger demand for gas and process compressors in third quarter
LNG activity helped drive order growth as the group posted record revenues and a 29% increase in orders received
CONNECT WITH THE TEAM
Jack Burke Senior Editor Tel: +1 262 527 0815 E-mail: [email protected]
Kristin Pride Brand Manager – North America/European Sales Executive Tel: +1 720 298 8546 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA