Capstone Nets Order For Oil Field Power

Premium Content

December 14, 2020

Capstone Turbine Corp. received a follow-on order from one of the world’s largest oil and gas companies for a C1000 Signature Series microturbine for a remote oil field in West Texas. The long-term rental order, secured by Lone Star Power Solutions, will be delivered and commissioned in January 2021.

Fueled by pipeline gas, the C1000S rental system will produce electricity to power on-site equipment. Capstone microturbines align with the needs of oil and gas producers as they can be used in all phases of production operations, including upstream, midstream and downstream in onshore and offshore applications, the company said.

This order supports the future expansion of Capstone’s long-term rental fleet from 8.6 MW to its target of 10 MWs by March 31, 2021. The company hopes to hit a rental fleet size of 21.1 MWs by March 31, 2022.

Latest News
U.S. natural gas production hits record in July
Permian growth and expanding takeaway capacity pushed gross withdrawals
GPA Midstream honors industry leaders and volunteers at 2026 convention
Awards presented in San Antonio recognized lifetime achievement, technical contributions, committee leadership and service to the midstream industry
PETROS, Höegh Evi to develop Kuching LNG terminal
Proposed Sarawak project would use an FSRU to supply natural gas for power generation and other regional energy needs
CONNECT WITH THE TEAM
Jack Burke Senior Editor Tel: +1 262 527 0815 E-mail: [email protected]
Kristin Pride Brand Manager – North America/European Sales Executive Tel: +1 720 298 8546 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA