Datum Compressors Pegged For Biofuels Plant

Premium Content

October 24, 2018

Abengoa, a Spanish EPC contractor, chose Siemens to supply a compressor train for Fulcrum BioEnergy’s Sierra BioFuels plant, which will use gasification technology to produce low-carbon fuels from municipal solid waste. The plant will take in the solid waste – normally allocated to landfills – and covert it into biofuel, a process that will reduce carbon emissions by more than 80%, according to Siemens.

Located on the outskirts of Reno, Nevada in Storey County, the plant can produce 11 million gpy (41,639,530 L/yr) of biofuel for the aviation industry. It will use multiple Datum compressors to compress synthesis gas at high pressures.

Siemens scope of supply includes a steam turbine, three synthesis gas Dresser-Rand Datum compressors and a variety of plant equipment (coolers, filters and valves). The equipment is expected to ship to Fulcrum’s plant in mid-2019.

Latest News
U.S. natural gas production hits record in July
Permian growth and expanding takeaway capacity pushed gross withdrawals
GPA Midstream honors industry leaders and volunteers at 2026 convention
Awards presented in San Antonio recognized lifetime achievement, technical contributions, committee leadership and service to the midstream industry
PETROS, Höegh Evi to develop Kuching LNG terminal
Proposed Sarawak project would use an FSRU to supply natural gas for power generation and other regional energy needs
CONNECT WITH THE TEAM
Jack Burke Senior Editor Tel: +1 262 527 0815 E-mail: [email protected]
Kristin Pride Brand Manager – North America/European Sales Executive Tel: +1 720 298 8546 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA