Responsive Image Banner

EIA: Difference In Appalachian, Henry Hub Prices Narrowing

Premium Content

August 02, 2018

The difference in price between Appalachian hubs and Henry Hub tends to follow a seasonal pattern, according to the U.S. Energy Information Administration.

Generally, this price spread widens in the summer months (April through September) and narrows in the winter months (October through March), when demand in regions with more pipeline capacity increases in the winter months.

As infrastructure in the Appalachian region has increased, however, the summer price spread to Henry Hub has decreased. For example, in the summer of 2015, the Dominion South price was $1.48 per million British thermal units (MMBtu) lower than Henry Hub, but by summer 2017, the Dominion South Hub was $1.07/MMBtu lower than Henry Hub. Winter spreads at the Dominion South Hub, on the other hand, have remained relatively flat in recent years, averaging $0.90/MMBtu lower than Henry Hub.

Other hubs in Appalachia have followed a similar seasonal pattern. Most of the recent pipeline buildout in Appalachia, including the Rover and Rockies Express pipelines, have been concentrated near the southwest border of Pennsylvania where the Dominion South hub is located. As a result, the price spread between Dominion South and Henry Hub has narrowed more than other hubs in north-central Pennsylvania, such as Leidy and Marcellus.

On June 1, Rover Pipeline’s interconnect to the Vector pipeline and Dawn Hub, near Detroit, Michigan, was completed, which increased takeaway capacity from southwest Pennsylvania and further narrowed the price spread between Dominion South and Henry Hub. In June, the Dominion South price was $0.71/MMBtu lower than Henry Hub; however, the Marcellus and Leidy hubs were $1.01/MMbtu and $1.04/MMbtu lower than Henry Hub, respectively.

The Transco Atlantic Sunrise, which will connect natural gas production centers in northeastern Pennsylvania to demand centers in Mid-Atlantic and southern states, is expected to be completed by the end of 2018. As this project comes online, price spreads between the northern hubs and Henry Hub will likely narrow.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, CompressorTech² News features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
Mountain Valley Pipeline files for FERC approval to expand system through MVP Boost project
Expansion to add 600 MDth/d of fully subscribed capacity, leveraging advanced compression technology and existing infrastructure
Burckhardt Compression expands North American service network
Company strengthens regional support with new hubs in Sarnia, Ontario, and Pottstown, Pennsylvania, plus recent ACT acquisition
JERA expands U.S. energy footprint with Haynesville Shale acquisition
Deal strengthens LNG supply chain and deepens Japan–U.S. energy cooperation
CONNECT WITH THE TEAM
Jack Burke Senior Editor Tel: +1 262 527 0815 E-mail: [email protected]
Kristin Pride USA Sales Representative Tel: +1 720 298 8546 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

WEBINAR: Carbon Capture and Storage

COMPRESSORTech² is giving you a front-row seat to the technologies making CCS work today. Join Baker Hughes and Caterpillar as they share hands-on case studies and deployment insights—from CO₂ compression and pipeline transport to secure underground storage.

📅 December 4 2025

I want to attend!