All sarawak Articles

PETROS, Höegh Evi to develop Kuching LNG terminal
Proposed Sarawak project would use an FSRU to supply natural gas for power generation and other regional energy needs
TotalEnergies acquiring stake in gas producer
Premium Content
50% interest in Malaysian independent
Shell delivers first gas from Timi platform
Premium Content
Wellhead platform in Malaysia that is powered by a solar and wind hybrid power system
Capstone Allocates Microturbines For Offshore Platforms
Premium Content
Capstone Turbine Corp. received orders for two ATEX-certified C200S microturbines and two C65 ATEX-certified microturbines that will be used at offshore platforms
Siemens Supplying Equipment For Malaysian Gas Field Project
Premium Content
Siemens Gas & Power received a contract to supply three SGT-300 industrial gas turbine generators, three mechanical-drive SGT-300 gas turbines and three