Responsive Image Banner

Honeywell Controls For Cassia Platform

Premium Content

November 25, 2019

Honeywell announced it will design and deliver the Integrated Control and Safety System (ICSS) that will enable BP to remotely manage its newest offshore compression platform off Trinidad and Tobago’s southeast coast.

As the project’s main automation contractor (MAC), Honeywell will deliver all systems, detailed engineering and lead procurement for the integrated control and safety system. The solution will be based on Honeywell’s flagship control system, the Experion Process Knowledge System (PKS). This is the third offshore platform for the Cassia Complex off the southeast coast of Trinidad and Tobago, with Honeywell serving as MAC for all three projects.

Located approximately 57 km off the southeast coast of Trinidad, the platform will have a throughput capacity of 1.2 bcfcd. The project will enable BP to access and produce low pressure gas reserves from currently producing fields in the Greater Cassia Area, maximizing recovery from these existing resources, the company said.

The project involves the construction of a new platform, Cassia C, BPTT’s 16th offshore facility. Gas production from the Greater Cassia Area will be routed to Cassia C for compression before being exported via the adjacent existing Cassia B platform. First gas from the facility is expected in the third quarter of 2021.

“Honeywell’s technology will enable BP Trinidad and Tobago to remotely run this typically unmanned platform efficiently, safely and with a high level of digital security,” said John Rudolph, president, Honeywell Process Solutions. “This project is a testament to Honeywell’s commitment to providing premier customer support, migration and continuous improvement. All this enables us to maximize the value of assets throughout its lifecycle.”

This new project follows the 2018 award of the MAC contract to Honeywell for BP Trinidad and Tobago’s Angelin offshore gas project. An earlier contract was awarded for the Juniper platform. Both projects are currently operational.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, CompressorTech² News features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
Three U.S. regions each produce more natural gas than most countries
Appalachia, Permian and Haynesville rank among the world’s largest supply sources
Reader Survey: Share your industry insights!
By sharing your insights, you’ll help guide future editorial coverage and provide a snapshot of industry sentiment heading into 2026.
Pembina and Petronas sign 20-year capacity agreement for Cedar LNG
Deal supports Canadian LNG export growth and long-term supply to Asian markets
CONNECT WITH THE TEAM
Jack Burke Senior Editor Tel: +1 262 527 0815 E-mail: [email protected]
Kristin Pride Brand Manager – North America/European Sales Executive Tel: +1 720 298 8546 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

WEBINAR: Carbon Capture and Storage

COMPRESSORTech² is giving you a front-row seat to the technologies making CCS work today. Join industry leaders as they share hands-on case studies and deployment insights - from CO₂ compression and pipeline transport to secure underground storage.

📅 December 4 2025

I want to attend!