Nyhamna Gas Facility Gets Approval For Expansion

By CT2 Staff13 February 2017

The Norwegian Petroleum Directorate (NPD) has approved the expansion of a gas plant in Nyhamna in Møre og Romsdal County, Norway.

The expansion will allow the Ormen Lange field in the Norwegian Sea to increase production by 883 Bcf to 1.1 Tcf (25 X 109 m3 to 30 X 109 m3) of natural gas. It will also increase Nyhamna’s export capacity from 2.5 to 2.9 Bcf (70 to 84 X 106 m3) per day, with the gas moving from the Sleipner A platform in the North Sea to the Easington gas terminal in northeast England.

The project, known as the Nyhamna expansion, consists of two main pieces. The first part involves land-based compression from Ormen Lange. A new compressor will handle gas pressure at Nyhamna as reservoir pressure falls. The second part includes export and process facilities for Polarled. This pipeline will transport natural gas to Nyhamna from the future Aasta Hansteen field.

The Polarled compression and export services are expected to start in the fall of 2018, with gas from the Dvalin field – also going through Polarled – starting up in the fall of 2020.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, CompressorTech² News features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
Low-emissions package from Aggreko
1300 kW system designed to meet strict emissions guidelines
97% of space booked for Bauma 2022
World’s largest construction trade fair confirms high level of participation
Use of fuel cell vehicles expected to increase in the U.S.
Rapidly developing technology to reduce greenhouse gas emissions