Responsive Image Banner

MAN Sending Seven Compressors For FPSO

Premium Content

October 28, 2020

MAN Energy Solutions will supply five radial compressor and two screw compressor trains for Equinor’s first Brazilian offshore gas extraction project.

MODEC, a supplier and operator of offshore systems for the global oil and gas industry, ordered the compressor trains, which will be installed aboard the largest floating production storage and offloading (FPSO) vessel to ever be delivered to Brazil, MAN said. The vessel will be deployed in the Bacalhau field, about 115 miles (185 km) off the Brazilian coast – south of São Paulo – at a water depth around 6726 ft. (2050 m).

The FPSO plant will be designed to produce and process up to 220,000 barrels of crude oil and up to 530 Mcfd (15 X 106 m3/d) of gas. The minimum storage capacity will be two million barrels of crude oil.
The compressor systems will help maintain the pressure in the Bacalhau field, thereby maximizing the production flow-rate and efficiency. The type RB compressors (two RB 45-4+5 and three RB 28-6) – which are driven by an electric, fixed-speed motor – will be used for gas-processing, full gas re-injection and gas-lifting applications.

The two SKUEL 510 screw compressors will be used as vapor-recovery units. These compressors pressurize any flash gas created and return it to the process instead of burning it off into the atmosphere.

While the radial compressors will be designed, manufactured and tested in Zurich, Switzerland, the screw compressors will be produced at the MAN site in Oberhausen, Germany. Delivery of all compressor trains is scheduled for the fourth quarter of 2021.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, CompressorTech² News features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
VIDEO: Caterpillar G3520K Gas Gen-set Targets Evolving Energy Needs
New model comes in three configurations with enhanced transiet response, fuel flexibility and more
Everllence technology selected for Stockholm Exergi’s large-scale BECCS project
Former MAN Energy Solutions unit to supply compressor and expander train for carbon removal facility
Wison New Energies and Siemens Energy sign MoU on floating LNG cooperation
Agreement focuses on turbine and compressor packages to streamline offshore project development
CONNECT WITH THE TEAM
Jack Burke Senior Editor Tel: +1 262 527 0815 E-mail: [email protected]
Gabriele Dinsel Brand Manager Tel: +49 711 34 06 73 50 E-mail: [email protected]
Kristin Pride USA Sales Representative Tel: +1 720 298 8546 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

WEBINAR: Carbon Capture and Storage

COMPRESSORTech² is giving you a front-row seat to the technologies making CCS work today. Join Baker Hughes and Caterpillar as they share hands-on case studies and deployment insights—from CO₂ compression and pipeline transport to secure underground storage.

📅 December 4 2025

I want to attend!