U.S. Natgas Withdrawals Set Record

EIA says underground inventories at 11-year low


Published:

The U.S. Energy Information Administration (EIA) reports that a winter of prolonged, widespread, bitter cold weather throughout much of the United States led to record-breaking natural gas withdrawals and brought inventories to an 11-year low.

EIA projected winter withdrawals of 2851 Bcf (80.7 x 109 m3). From Nov. 1, 2013 through March 10, 2014, U.S. consumption of gas averaged 91.2 Bcfd (2.58 x 109 m3/d), 10% higher than last winter and 13% over the average during the past five winters.

The agency said during the April-though-October injection season, operators will keep compressors running in order to replenish storage caverns and fields with 2500 Bcf (70.8 x 109 m3), surpassing the 2001 record by more than 90 Bcf (2.5 x 109 m3), and ending the injection season at 3459 Bcf (98 x 109 m3).

It said that should be no problem. Spot prices, slightly above US$4/MMBtu, will be high enough to keep electric power consumption of gas essentially flat compared to levels a year ago. Meanwhile, gas production will rise 2% to 68.1 Bcfd (1.9 x 109 m3/d).

Archive »Archive »

Follow-up LNG Order For Siemens

Siemens Energy has received an order from Chengdu Cryogenic Liquidation Equipment Co. Ltd. to provide two compressor trains for a liquefied natural gas (LNG) project.

Gioffredi Named CEO of Zahroof Valves

Anthony (Tony) Gioffredi has joined Zahroof Valves Inc., Houston, as CEO.

Scott Rowe Named Cameron President, COO

Cameron has appointed Scott Rowe to the newly created position of president and chief operating officer effective Oct. 1. He will report to Jack Moore, who remains chairman and CEO.

GE To Power Texas LNG Project

GE will provide electric-motor-driven technology that will enable the Freeport liquefied natural gas (LNG) export project, on the Gulf of Mexico south of Houston, to comply with local air emissions standards.

Alaskan Pipeline-LNG Project Seeks Permits

Sponsors of the Alaska LNG Project have filed asked the U.S. Federal Energy Regulatory Commission (FERC) to begin the permitting process for construction of an 800-mile (1300 km) gas pipeline from Prudhoe Bay field to a planned liquefaction plant at Nikiski on the Kenai Peninsula.