Edit ModuleShow Tags

More Shale Growth to Challenge Pipelines

INGAA says U.S., Canada firms need to invest US$30 billion annually


Published:

The United States and Canada will require annual average midstream natural gas, crude oil and natural gas liquids midstream infrastructure investment of nearly US$30 billion per year, or US$641 billion (in 2012 dollars) from 2014 to 2035, a study finds.

ICF International prepared the report for the INGAA Foundation and America’s Natural Gas Alliance. It updates a 2011 gas infrastructure report and reflects changes in the natural gas, NGL and crude oil industry in recent years.

The paper said midstream natural gas investment must be US$14 billion per year, or US$313 billion total, to accommodate new gas supplies, particularly from the prolific shale plays, and growing demand for gas in power generation, industrial applications and exports. Midstream includes mainlines, laterals, processing, storage, compression and gathering lines.

Meanwhile, US$2.5 billion per year, or US$56 billion total, will be needed for natural gas liquids (NGL) infrastructure and US$12.4 billion per year, or US$271.8 billion total, will be needed for crude oil facilities.

INGAA Foundation President Don Santa said although previous reports only focused on natural gas, it has become necessary to view energy pipelines in holistic terms because of the linkage between natural gas, crude oil and NGLs. “Pipelines make the shale revolution possible -– whether it’s shale gas, tight oil or NGLs,” he said.

Edit ModuleShow Tags

Archive »Archive »

Answer: Past Tense - January/February 2017

Past Tense - January/February 2017

Ariel Compressors To Power Two Miami CNG Stations

Love’s Trillium CNG has received a 10-year, more than US$330 million contract to build two public-access compressed natural gas (CNG) fueling stations for the Miami-Dade Transit in southern Florida.

GMRC Call For Papers

FERC Approves Seven Projects Before No-Quorum Period

The Federal Energy Regulatory Commission (FERC) certified seven projects at the start of the month in anticipation of entering into a no-quorum period, according to the U.S. Energy Information Administration (EIA).