Edit ModuleShow Tags

Kinder Morgan Plans Carbon Dioxide Pipeline

Lobos Project will support Permian Basin injection


Published:

Kinder Morgan Energy Partners L.P. will build a 213 mile (343 km), 16 in.(400 mm) pipeline to move carbon dioxide (CO2) from the its St. Johns field in Apache County, Arizona, to its Cortez Pipeline in Torrance County, New Mexico.

The new Lobos pipeline will have an initial capacity of 300 MMcfd (8500 m3/d) and will support current and future enhanced oil recovery (EOR) projects owned by Kinder Morgan and other operators in the Permian Basin of West Texas and eastern New Mexico. The company did not disclose the specific compression program for the line.

Kinder Morgan will spend US$300 million on the pipeline and US$700 million to drill wells and build field gathering, treatment and compression facilities at the St. Johns field. The project is expected to be in service by the third quarter of 2016.

“This project will help address the market’s growing demand for CO2 and enable Permian Basin producers to increase oil production by using the product in EOR projects,” said James Wuerth, president of Kinder Morgan’s CO2 group. “EOR is measurably increasing the nation’s recoverable oil supply and will continue to do so in the future.”

Edit ModuleShow Tags

Archive »Recent Articles

GE’s CNG In A Box Finds Home In Colorado CNG Station

Weld County, Colorado, welcomed its seventh public compressed natural gas (CNG) station, which is also the first in the area to feature GE’s CNG In A Box modular system, according to Sparq Natural Gas.

EIA: Most Locations See Nat Gas Price Drop

Natural gas spot prices dropped at most locations during the July 13 to July 20 report week, according to the U.S. Energy Information Administration (EIA).

Petrobras Looks To Scale Back

Petrobras, a Brazilian oil corporation, plans to sell or share control of its pipelines and open its liquefied natural gas (LNG) terminals to third parties as part of a plan to scale back its role in the state’s natural gas industry.

J-W Energy Exits Midstream, Upstream Markets

J-W Energy Co. has sold all of its oil and gas and midstream assets to affiliates of Aethon United LP, signaling an end to the company’s run in the upstream and midstream markets.

Siemens To Power The Missing Link

Siemens received an order from the Trans Adriatic Pipeline consortium for six, 15 MW turbo compressor trains. The equipment will be used in the Trans Adriatic Pipeline (TAP), which is part of the Southern Gas Corridor in Europe.