Edit ModuleShow Tags

Dresser-Rand Makes Major Move Into Gas Liquefaction


Published:

Dresser-Rand has announced the successful operation of its newly developed small-scale liquefied natural gas (LNG) production system, named LNGo.

“We are very excited about this technology for small-scale LNG production, which allows for very small stand-alone plants that are portable and can be moved to support changing requirements and needs,” President and CEO Vincent Volpe Jr. said. “The standard LNGo plants are sized to produce approximately 6000 gallons (22,712 L) of LNG per day.”

Dresser-Rand designed, constructed and commissioned its demonstration plant, which in December reached a milestone with the initial production of LNG. Now, extended performance and endurance tests are being performed as the final step prior to full market release.

Read the full article in the March issue of COMPRESSORtech2.

Edit ModuleShow Tags

Archive »Archive »

Dominion Seeks To Expand Capacity Of PA Natural Gas Pipeline

Dominion Transmission plans to increase the capacity of a natural gas pipeline that runs through the Chambersburg, Pennsylvania area, a move that would cost US$210 million.

National Fuel To Build Compressor Station In Town Of Hinsdale

National Fuel Gas Supply recently received approval from the Federal Energy Regulation Commission (FERC) to construct a new compressor station in the Town of Hinsdale, New York.

Circor Energy Names Erik Wiik President

Erik Wiik has joined CIRCOR Energy as group president. Wiik was previously at Aker Solutions for 24 years, where he managed groups of businesses delivering advanced subsea technology to the global oil and gas industry.

HiPower Systems Signs New Distributor

HiPower Systems, a manufacturer of power generation and power distribution equipment in the U.S. and Canada, has signed RDO Equipment Co. to be a distributor in North Dakota, South Dakota, Minnesota and eastern Montana.

Altenesol Completes 15-Year LNG Contract

IAHL Corp. announced that its subsidiary, Altenesol LNG Colombia S.A.S., has finalized a 15 year take-or-pay agreement for its first LNG train.