EIA Pessimistic on GTL Plants

Small plants maximizing wax output could be built


Published:

The U.S. Energy Information Administration said poor economics will prevent the construction of any large-scale gas-to-liquids (GTL) plants in the U.S. through 2040, although small ones might be built.

Two large-scale GTL plants are operating in Malaysia, two in Qatar and one in South Africa. A large plant is proposed for Lake Charles, Louisiana, and small ones are planned for Karns City, Pennsylvania, and Ashtabula, Ohio. Last December, Shell cancelled plans to build a large-scale facility in Louisiana.

The Fischer-Tropsch synthesis process is commonly used to convert methane to waxes and liquid fuels, but uses high pressures and temperatures that require an expensive reaction vessel. An alternative technology uses a “micro-channel” reactor and proprietary catalysts that produce liquids on much smaller scales.

EIA said U.S. imports of waxes have grown steadily over the last decade for the manufacture of candles, paints and coatings, resins, plastic, synthetic rubber, tires, and other products. It said most GTL developers are trying to configure their plants to maximize the output of waxes and lubricating products.

Archive »Archive »

USA Compression Fleet Up 24%

USA Compression Partners (USAC) has reported its fleet totaled1.4 million hp (1044 MW) on Sept. 30, up 24% from the third quarter of 2013.

Exterran Gets Oklahoma Equipment Order

Exterran has signed an agreement with Woodford Express LLC for a natural gas processing project.

Answer: Athens Of The South - October 2014

Athens Of The South - October 2014

Exterran’s C-Series Gas Compression Packages

Exterran recently launched its C-Series line of configurable compression packages, pre-engineered with a wide range of configuration options.